Location: Home FAQ

How long to receive the mechanical equipment after purchase

Article Details

Spot products will be shipped within 3-5 days after the trial operation of the machine, and customized products will generally be shipped within 20-35 days depending on the construction period. Customized products are designed by professional engineers according to the different raw materials and processing volume of customers to ensure that each machine meets customer needs.

Copyright: Copyright belongs to Hengju Machinery! Reprint please indicate the source: https://www.hengjumachinery.com/faq/how-long-to-receive-the-mechanical-equipment-after-purchase.html

Submit Question

Needs Help? Let’s Get in Touch

Recommended
How is the Rotary Cooling Machine applied in the environmental recycling industry?
It's used for cooling incineration bottom ash and other high-temperature waste materials, stabilizin
Hengju Machinery
FAQ Sep 19, 2024
How is the Rotary Cooling Machine used in the metal smelting industry?
It's used for cooling metal slag and aluminum dross, facilitating precious metal recovery, and preve
Hengju Machinery
FAQ Sep 19, 2024
What are the advantages of a Rotary Cooling Machine?
High cooling efficiency, energy-saving, easy operation, adaptability, safety and reliability, and hi
Hengju Machinery
FAQ Sep 19, 2024
What is a Rotary Cooling Machine?
What is a Rotary Cooling Machine?A Rotary Cooling Machine is an industrial device used for cooling h
Hengju Machinery
FAQ Sep 19, 2024